LOCAL REQUIREMENTS, CLEAR WORKFLOWS

Every country has
its own rules.

Shape fields, documents, approval routes and external handoffs around the market your institution serves.

01Institution workflowRoles · evidence · approvals
02Country requirementsFields · document variants · wording
03External handoffManual now · official connection when agreed

A local rule should have a clear place to live.

A country pack defines the fields, formats, consent and document rules for a market. The institution adds its own roles and approvals. Each case keeps the version used when it began, so later changes do not silently rewrite history.

Country pack+Institution setup→Case version

A handoff the team can account for.

The UAE example shows a manual MoHESR recognition route. It does not represent a live electronic ministry connection.

01

Approve the record

The institution completes its configured internal reviews and freezes the eligible Original.

02

Prepare the handoff

Staff prepare a traceable package and record how and when it was submitted outside AttestPod.

03

Record the outcome

The external reference, status and recognised result are stored separately from the university-issued record.

Electronic ministry connectionScoped only after official access, technical specifications and approval are available.

Know which work lives where.

Use this sample map to distinguish what the institution can configure, what staff handle outside the product, and what needs official electronic access.

01 / CONFIGURE

Inside AttestPod

Agree the local record fields, consent, document formats, roles and approvals. Save a version with each case.

Institution + country teamConfiguration and review
02 / HAND OFF

Outside the product

Where a manual ministry route applies, staff submit externally and record the reference and result back on the case.

Example: UAE MoHESRManual handoff only
03 / CONNECT

After official access

Only then scope an electronic connection around approved specifications, permissions, failure handling and testing.

Ministry or system ownerAccess and approval required

Connect with evidence, not assumptions.

Where a system contract exists, a connector can be scoped around its real interface, permissions and failure states. Until then, the workflow still needs a clear manual path.

Talk through your systems ↗
01Map the routeWho submits, which system owns the result, what evidence returns?
02Define the connectionAgree data, access, security and operational responsibilities.
03Test the complete journeyHandle corrections, failures and reconciliation as part of the design.